AC Not Cooling in Dubai? 8 Causes and What to Do About Each One
Your AC is running. The fan is spinning. But the…
Abbas Technical Services carries out demolition work across Dubai — from stripping a single bathroom back to the slab, to removing load-bearing walls, to clearing a plot entirely. We are licensed for demolition, insured for it, and we handle the approvals.
What makes us different from a demolition-only contractor is what happens next. Most firms hand you a stripped shell and leave, and you spend the following month coordinating an electrician, a plumber, a tiler, a carpenter and a ceiling crew. We already have all of them. The wall comes out and the same company puts the room back together.
Every demolition Dubai project we take on falls into one of these categories:
The scale varies enormously. The parts that never change are the make-safe, the protection, the approvals and the disposal record.
Almost nobody demolishes for the sake of it. They demolish because something better is going in. That reframes the job entirely: strip-out is not the destructive bit before the real work — it is the first stage of the build, and doing it badly costs you at every stage afterwards.
Make-safe comes before anything is touched. Circuits isolated at the board by our electricians, water isolated and pipework capped by our plumbers, AC units decommissioned and set aside for reinstallation by our AC team, and any gas capped and certified. A strip-out crew that starts swinging without this is how a live cable or a charged pipe gets cut.
Most contractors quote the maximum scope, because a bigger strip-out is a bigger invoice. At survey we do the opposite: we tell you what is worth keeping.
Usually worth keeping:
Usually worth removing even if it looks fine:
This section is not a sales pitch. Every item on the “keep” list reduces what we invoice you. It is here because a contractor who tells you where not to spend money is the one worth hiring for the parts where you must.
Structural demolition is a different discipline from strip-out. It touches the load path, and it is engineered before it is executed.
Removing a Load-Bearing Wall
The single most common structural request in Dubai villa renovations — usually opening a kitchen into a living area. The sequence is fixed and we do not shortcut it: structural engineer’s assessment, a propping design for the actual load above, temporary propping installed and checked, wall removed in controlled sections, a steel or concrete beam installed to carry the load, propping struck only once the beam is bearing properly. Beams and structural steel are fabricated in-house by our metal fabrication team.
If a contractor offers to take out a load-bearing wall without an engineer and without propping, that is not a cheaper quote — it is a different service, and the difference is whether the floor above stays where it is.
Forming a New Opening
Widening a doorway, creating a pass-through, adding a window. Smaller than a full wall removal but the same principle: the load above the opening has to go somewhere, which means a lintel sized for the span and the load, not a lintel sized by eye.
Full Building Demolition
Villas, extensions, outbuildings, boundary walls and warehouse structures taken down to slab or cleared plot. Building demolition of a whole structure needs a demolition permit from the authority governing your plot and formal DEWA and telecom disconnection before work begins — a different approval track from the renovation NOC in §10, and we confirm which applies at survey.
If you are vacating an office, retail unit or warehouse in Dubai, your lease almost certainly contains a reinstatement — or “make-good” — clause. It obliges you to return the space to the condition it was handed over in, which usually means removing every alteration your business made to it.
Typical reinstatement scope:
Why it matters commercially: reinstatement obligations are enforced through your security deposit and, in many leases, through holdover provisions — meaning you can remain liable for rent at premium rates until the space is handed back in acceptable condition. If the landlord appoints their own contractor to finish the work, you are charged for it, usually well above market rate.
How to run it properly: read the reinstatement clause and the original handover condition before you plan anything — leases differ, and some waive parts of the obligation. Start six months before expiry rather than six weeks. Agree the scope with the landlord or building management in writing before work begins. And arrange a joint inspection while our crew is still on site, so anything disputed gets fixed immediately instead of after demobilisation.
Reinstatement obligations vary by lease. Send us your clause and we will scope against what it actually requires — not against a generic assumption.
Where a project goes below ground, we handle it under the same contract rather than bringing in a separate groundworks firm.
One rule we do not bend: we survey for buried services before breaking ground, and use GPR scanning where the risk justifies it. Striking a live DEWA cable or an Etisalat duct means a site shutdown, a repair bill and weeks of delay — and it is entirely avoidable. Trenching and excavation done properly is mostly about what you find out before the bucket goes in.
We take demolition work across Dubai, including Al Quoz, Jumeirah, Umm Suqeim, Al Barsha, Business Bay, Downtown Dubai, Dubai Marina, JLT, JVC, Mirdif, Deira, Bur Dubai, Al Warqa, Nad Al Sheba, Dubai Hills, Arabian Ranches, Springs and Meadows, The Villa and Dubai Silicon Oasis.
We also work across Sharjah, Ajman, Abu Dhabi and Umm Al Quwain. Approval requirements differ by emirate and by community — we confirm the route for your property at survey.
Not general maintenance cover stretched to fit. Ask us for the certificates before you appoint us — and ask everyone else too. A demolition company in Dubai that hesitates on that request has told you something important.
Electrical isolation, plumbing capping, AC decommissioning, gas capped and certified — by our own trades, documented, before a single tool comes out.
Every load-bearing element removed with a structural engineer's assessment and propping designed for the actual load. No exceptions and no verbal assurances.
Sealed containment, protected routes, dust control at source, daily clearance. Especially in occupied homes and towers with strict building rules.


Demolition work covers the controlled removal of parts or all of a structure. It divides into soft demolition — stripping out non-structural elements such as partitions, ceilings, flooring, joinery and fit-out MEP — and structural demolition, which removes load-bearing walls, slabs or entire buildings and requires engineering input and formal approvals.
Interior strip-out typically runs AED 5–12 per square foot, so a 3,000 sq ft villa usually falls between AED 15,000 and AED 36,000 depending on how much is being removed, how heavy the debris is, and whether the property is occupied. Individual elements price separately: a bathroom strip-out is AED 2,500–8,000 and a kitchen AED 4,000–12,000.
Yes. Removing or adding a partition wall normally requires an authority permit — Dubai Municipality for most mainland buildings, Trakhees or DDA in their own jurisdictions — plus an NOC from your building management or master community. A typical apartment layout change costs roughly AED 4,000–20,000 in approvals before deposits, and takes three to five weeks end to end.
Yes, and it must be engineered. It requires a structural engineer's assessment, temporary propping designed for the actual load above, controlled removal in sections, and a steel or concrete beam installed to carry the load before the propping is struck. Removing a load-bearing wall without propping and an engineer is how floors above come down.
Strip-out, also called soft demolition, removes only non-structural material — partitions, ceilings, flooring, joinery and fit-out services — leaving the structure untouched. Demolition removes structural elements such as load-bearing walls, slabs, frames or whole buildings. Strip-out is faster, cheaper and needs a lighter approval track.
A single bathroom takes two to three days. A full apartment strip-out runs three to seven working days, and a villa one to two weeks. Occupied properties take longer than empty ones because of containment, protection and restricted working hours.
Often, yes — with sealed containment, protected access routes, dust control at source and daily debris clearance. In a multi-bathroom villa we sequence so you always have one in use. In a single-bathroom apartment there will be days when you need to be elsewhere, and we tell you how many before you commit.
All construction and demolition waste goes to a Dubai Municipality approved facility with a Waste Transfer Note tracked in the Smart Waste System. Inert material such as concrete, tile and screed goes to recycling or the Al Qusais inert landfill, mixed waste to Al Warsan or a licensed recycler, metals to scrap recovery with the value credited back, and hazardous material to the Jebel Ali Hazardous Waste Facility.
Reinstatement is a lease obligation to return a commercial space to its handover condition when you vacate — removing partitions, ceilings, added flooring, cabling and fit-out, then making good. Whether it applies and how far it extends depends on your specific lease. Failing to complete it typically means losing your deposit and, under holdover provisions, continued rent liability until the space is accepted.
Yes. Abbas Technical Services covers electrical, plumbing, AC, tiling, carpentry, false ceilings, metal fabrication, irrigation and general renovation in-house, so the same company that strips the property puts it back together under one contract and one programme.
Your AC is running. The fan is spinning. But the…
Understanding 10 Common AC Repair Issues and How to Prevent…
A frozen air conditioner is a common issue that can…